Home/Plumbing Services/Shower & Bathtub Installation
Plumbing · Showers & Baths
Shower and bathtub installation in Valencia — waterproof before beautiful.
A shower is a room that rains indoors. We build it in the right order — falls, waterproofing, pressure — so the rain head and glass are the celebration of a job done right underneath.
In plain terms
Walk-in shower installation — the tub-to-shower conversion done right.
Half of Valencia is swapping a 1980s tub for a walk-in shower — and the difference between a spa and a slow leak is what happens before the tray: demolition, falls, tanking, test. We do the invisible half like it's the visible one.
Screens, columns and heads
Tub out Monday, shower by Wednesday
Trays proven before tiling
Waterproofing membrane, documented
Why VELTORRA Fontanero
What's engineered under a good shower.
Correct falls
Water walks to the drain — never pools, never wanders.
Real waterproofing
Tanking membrane on the whole wet zone, photographed.
Balanced supply
Thermostatic valves that hold temperature when the kitchen runs.
Solid fixing
Screens and columns anchored into structure, not just tile.
Silicone that lasts
Sanitary-grade, laid clean on dry edges — the detail everyone sees.
How it works
How a tub-to-shower conversion works.
Measure & design
Space, drain position and glass measured; fixed quote.
Demolition & falls
Tub out, floor prepared with proper slopes.
Waterproof & test
Membrane applied, flood-tested, photographed.
Fit & finish
Tray, glass, column and clean silicone lines.
The price
Shower installation cost in Valencia.
Fittings (columns, screens, heads) from €290; complete tub-to-shower conversions quoted in writing after measuring — typically 2–3 working days. Materials, membrane and tests included in the figure.
- Demolition and disposal
- Falls and waterproofing membrane
- Flood test before tiling
- Glass and column installation
- Written guarantee on the wet zone
Is this you
Time to convert or refresh if…
Stepping over the tub is becoming athletic
The silicone line is a biology experiment
The shower goes arctic when a tap opens
The screen door escapes its rail weekly
Grout lines darken no matter the scrubbing
You dream of a rain head with real pressure
Service area · 39°28′N
Shower installers near me — Valencia metro and province.
Showers and baths installed across Valencia, Torrent, Paterna, Burjassot, Mislata, L'Eliana, Godella, Rocafort, Alboraya and Sagunto — waterproofed, tested and photographed the same way everywhere.
Related services
Plan the whole system, not one piece.
The VELTORRA standard
Documented like every VELTORRA project.
Concealed pipework is photographed before it disappears behind walls, floors and tiles.
Pressures, joints and flow verified by measurement — not by assumption.
A documented workmanship guarantee alongside the manufacturer's warranty.
A single named person answers for your job — by message, if you prefer.
Questions, answered
Showers and bathtubs — asked before the sledgehammer.
How much does a tub-to-shower conversion cost in Valencia?
Quoted in writing after measuring, with the membrane, falls, tray and testing included. Typical conversions run 2–3 working days; fittings alone start at €290.
How long is the bathroom out of action?
For a standard conversion, two to three working days — and we sequence so the WC and basin stay usable each evening.
Why does temperature jump when someone opens a tap?
Pressure imbalance at an old mixer. A thermostatic valve holds your set temperature regardless of what the kitchen is doing — standard in our installations.
Can you install a freestanding bathtub?
Yes — floor loading, drain routing and the floor-mounted tap are the engineering; we confirm all three before the tub is ordered, not after it arrives.
Is the flood test really necessary before tiling?
It's 24 hours that protects decades. The tray and tanking hold water before tiles go on — if anything weeps, it weeps in front of us, not into the flat below.
Build the rain right.
Send photos of the current bathroom and rough sizes — you'll get an honest verdict on layouts and a fixed figure before any demolition.
